Estimation Bill Form – MaisonPro

Estimation Bill Form

Sl. Description Qty. M. Cost L. Cost GST Total
1 Gas Top-Up 2 0 700 252 1652
2 Running Capacitor (4-25) 2 0 540 194.4 1274.4
3 Running Capacitor (36-60) 2 0 675 243 1593
4 Insulation Foam (Per feet) 30 0 15 81 531
5 12in Copper Pipe (Per Feet) 30 0 270 1458 9558
Grand Total 14608.4
Go To Top